Overview
TRANE PLT 7 MANUFACTURING is a cooling tower facility in La Crosse, Wisconsin, United States, supporting HVAC manufacturing operations. It operates under ASHRAE 15 safety standards and federal refrigerant regulations.
TRANE PLT 7 MANUFACTURING is a cooling tower facility located at 2600 Losey Blvd South in La Crosse, Wisconsin, United States. The plant is operational and serves the manufacturing sector, specifically under NAICS code 333415 for air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing. As part of Trane Technologies, this facility supports the production of HVAC systems. The facility operates under the regulatory framework of the United States, which includes ASHRAE 15 for refrigeration safety and the Environmental Protection Agency's regulations under the Clean Air Act, including the phase-down of high-global-warming-potential refrigerants. Cooling towers in manufacturing settings typically use water as a heat transfer medium, with efficiency measured by the coefficient of performance (COP). The scale of this facility is consistent with industrial manufacturing plants in the Midwest. Environmental significance includes the management of refrigerants and water usage. The facility likely employs best practices for refrigerant containment and water conservation, aligning with industry standards. As part of a major HVAC manufacturer, the plant contributes to energy-efficient cooling solutions that reduce overall environmental impact in the sector.
Environmental context
Cooling towers in manufacturing facilities like TRANE PLT 7 use water for heat rejection, with environmental considerations including water consumption and potential for evaporative losses. Refrigerant management is critical, as leaks of high-GWP refrigerants can contribute to climate change. The facility operates under U.S. EPA regulations that mandate leak detection and repair, and the Kigali Amendment to the Montreal Protocol drives a global phase-down of HFCs. Efficiency improvements, such as optimizing COP, reduce energy use and associated emissions.
Frequently asked questions
TRANE PLT 7 MANUFACTURING is located at 2600 Losey Blvd South, La Crosse, Wisconsin 54601, United States.
It is a cooling tower facility used for industrial manufacturing, specifically supporting the production of HVAC equipment under NAICS code 333415.
Cooling towers in the U.S. must comply with ASHRAE 15 for refrigeration safety and EPA regulations under the Clean Air Act, including refrigerant management and leak repair requirements.
The Kigali Amendment to the Montreal Protocol mandates a global phase-down of high-global-warming-potential HFC refrigerants, driving the adoption of lower-GWP alternatives in cooling systems.
Cooling towers consume water for heat rejection and may use refrigerants with high global-warming potential. Efficient operation and proper maintenance minimize water use and refrigerant leaks.
Other Cooling Tower plants in United States · 6 nearby