Risk: Medium Substation Operational

84B Providence Paralleling Station - Substation in Providence, Rhode Island, USA

United States

Overview

84B Providence Paralleling Station is an operational substation in Providence, Rhode Island, United States, operating at 25 kV and 50 kV voltage levels.

84B Providence Paralleling Station is a substation located in Providence, Rhode Island, United States. It operates at voltage levels of 25 kV and 50 kV, indicating it serves both distribution and sub-transmission functions within the local electrical grid. The facility is currently operational and plays a key role in managing power flow and voltage stability in the Providence area. As a substation in the United States, this facility operates under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) for wholesale electricity markets and reliability standards set by the North American Electric Reliability Corporation (NERC). The dual voltage configuration suggests it may serve as a critical node connecting higher-voltage transmission lines to lower-voltage distribution networks, typical of urban substations. The station's location in Providence, the state capital and a major urban center, underscores its importance in supporting residential, commercial, and industrial electricity demand. Its role in voltage regulation and power distribution contributes to grid reliability for the surrounding community, aligning with NERC's reliability standards for bulk power systems.

Environmental context

The substation is situated in an urban environment in Providence, Rhode Island, which influences its operational considerations. Urban substations like this one are typically designed with compact layouts and may include noise mitigation measures due to proximity to residential and commercial areas. The local climate, with seasonal temperature variations, requires robust insulation and cooling systems for transformers and switchgear. The station's dual voltage levels suggest it handles significant power flows, necessitating careful management of electromagnetic fields and compliance with environmental regulations.

Frequently asked questions

84B Providence Paralleling Station is located in Providence, Rhode Island, United States, at coordinates 41.860597, -71.406260.

The substation operates at 25 kV and 50 kV, indicating it handles both distribution and sub-transmission voltage levels.

The facility is currently operational.

Substations in the United States are subject to NERC reliability standards for grid stability and FERC regulation for wholesale electricity markets, along with local utility requirements.

A paralleling station connects multiple power sources or transmission lines to synchronize and share loads, improving grid reliability and flexibility.