Overview
ABW Tap Substation is an operational electrical substation in Pennsylvania, United States, operated by Penelec. It operates at a voltage of 46 kV, serving the local grid.
ABW Tap Substation is an electrical substation located in Pennsylvania, United States. Operated by Penelec, it is part of the regional transmission and distribution network, stepping down voltage for local distribution. The substation operates at 46 kV, a typical voltage for sub-transmission or primary distribution in the US. As a substation under the jurisdiction of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ABW Tap Substation must comply with reliability standards for grid stability. Penelec, a subsidiary of FirstEnergy, operates this facility within the PJM Interconnection, one of the largest regional transmission organizations in the US. The substation likely includes switchgear and transformers to manage power flow. The substation plays a critical role in maintaining reliable electricity supply to the surrounding area. Its location in rural Pennsylvania supports local communities and industries. The 46 kV voltage level indicates it serves as a distribution substation, feeding power to smaller transformers for end-users.
Environmental context
The substation is located in a rural area of Pennsylvania, where the local environment includes agricultural land and forests. Electrical infrastructure in such settings must consider wildlife interactions and vegetation management to prevent outages. The 46 kV voltage level poses minimal electromagnetic field concerns compared to higher voltage lines, but standard mitigation measures are applied.
Frequently asked questions
ABW Tap Substation is located in Pennsylvania, United States, at coordinates 40.530974, -78.052903.
ABW Tap Substation operates at a voltage of 46 kV, which is typical for sub-transmission or primary distribution in the US.
ABW Tap Substation is operated by Penelec, a subsidiary of FirstEnergy, and is part of the PJM Interconnection grid.
As part of the US electrical grid, ABW Tap Substation must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.
A 46 kV substation typically steps down voltage from higher transmission levels for local distribution, serving residential, commercial, and industrial customers in the area.