ACEC Spring Lake is an operational electrical substation in Wisconsin, United States, operating at 69 kV. It plays a role in regional grid stability and power distribution.

ACEC Spring Lake is an electrical substation located in Wisconsin, United States, with an operational status. The facility operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level infrastructure, serving to step down power for local distribution networks. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards for grid stability and FERC oversight for transmission-level assets. While 69 kV is below the typical threshold for NERC's bulk electric system, it still adheres to state-level utility regulations and interconnection standards. As part of the regional electrical infrastructure, ACEC Spring Lake contributes to the reliable delivery of electricity to surrounding communities. Its location in Wisconsin places it within a grid that supports a mix of industrial, agricultural, and residential loads, with the substation likely serving as a critical node for local power distribution.

Environmental context

The substation is located in a rural area of Wisconsin, where the surrounding environment includes agricultural land and natural habitats. Electrical infrastructure in such settings must balance operational needs with environmental considerations, such as minimizing visual impact and ensuring compliance with local land-use regulations. The 69 kV voltage level indicates a moderate scale of infrastructure, with typical environmental management practices including vegetation control and stormwater management.

Frequently asked questions

ACEC Spring Lake is located in Wisconsin, United States, at coordinates 44.030300, -89.158028.

ACEC Spring Lake operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level substations.

ACEC Spring Lake is currently operational, meaning it is actively involved in the electrical grid.

In the United States, substations are subject to NERC reliability standards for grid stability and FERC regulations for transmission assets. State-level utility commissions also oversee distribution-level infrastructure.

A 69 kV substation typically steps down transmission voltage for local distribution, serving as a critical link between high-voltage transmission lines and lower-voltage distribution networks that supply homes and businesses.