Risk: Medium Substation Operational

Aldrich Substation - 115 kV Electrical Substation in the United States

United States

Overview

Aldrich Substation is an operational electrical substation in the United States, handling 115 kV voltage. It plays a key role in regional grid stability and power distribution.

Aldrich Substation is an operational electrical substation located in the United States, with coordinates 44.977521, -93.290543. The facility operates at a voltage level of 115 kV, which is typical for sub-transmission and distribution substations that serve urban and suburban areas. As part of the U.S. electrical infrastructure, it is subject to NERC reliability standards and FERC regulation for grid stability. The substation's 115 kV voltage class places it in the medium-to-high voltage range, commonly used for distributing power from transmission systems to local distribution networks. In the United States, substations like Aldrich are critical for maintaining grid reliability and are often equipped with modern switchgear and automation systems compliant with ISO/IEC 61850 standards. The facility's operational status indicates it is actively contributing to the regional power grid. Environmentally, Aldrich Substation supports the integration of renewable energy sources and helps reduce transmission losses by stepping down voltage for local consumption. Its location in a populated area underscores its importance in providing reliable electricity to homes and businesses. The substation's role in the grid enhances energy security and supports the transition to a more resilient electrical infrastructure.

Environmental context

The substation's 115 kV voltage level is critical for grid stability in the surrounding region, which likely includes a mix of urban and suburban development. Its location in a populated area means it supports local energy demand while minimizing transmission losses. The facility's operation aligns with modern grid practices that emphasize reliability and integration of distributed energy resources.

Frequently asked questions

Aldrich Substation is located in the United States at coordinates 44.977521, -93.290543.

Aldrich Substation operates at a voltage of 115 kV, which is a common voltage for sub-transmission and distribution substations.

Aldrich Substation is currently operational and actively contributing to the regional power grid.

Substations in the United States are regulated by NERC reliability standards and FERC for transmission-level assets, and often follow ISO/IEC 61850 for substation automation.

A 115 kV substation steps down voltage from transmission lines to distribution levels, ensuring reliable electricity supply to local communities and supporting grid stability.
UtilityRadar
More
Press Esc to close · Browse by sector