Overview
Alpine Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a key role in regional grid stability and power distribution.
Alpine Substation is an operational electrical substation located in the United States, with coordinates 37.342230, -77.285176. The facility operates at a voltage of 230 kV, classifying it as a high-voltage substation critical for transmission-level grid stability. As part of the U.S. electrical infrastructure, it supports the reliable delivery of electricity across the region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission assets. The 230 kV voltage level is typical for bulk power transmission, connecting generation sources to distribution networks. The facility's operational status indicates it is actively contributing to the grid. Alpine Substation's location in the United States places it within a well-regulated electrical infrastructure system. Its role in voltage transformation and power routing is essential for maintaining grid resilience and meeting regional electricity demand. The substation's design and technology align with modern standards for safety and efficiency.
Environmental context
The substation is situated in a region with a temperate climate, where seasonal variations can impact electricity demand. Its 230 kV voltage level indicates a role in long-distance power transmission, which may involve corridors through mixed urban and rural landscapes. The facility's operation adheres to environmental regulations that minimize electromagnetic field exposure and land use impacts.
Frequently asked questions
Alpine Substation is located in the United States at coordinates 37.342230, -77.285176.
Alpine Substation operates at a voltage of 230 kV, which is typical for high-voltage transmission substations.
Alpine Substation is currently operational, actively contributing to the electrical grid.
As a U.S. electrical substation, Alpine Substation must comply with NERC reliability standards and FERC regulations for transmission assets.
A 230 kV substation is a key component of the transmission network, stepping down voltage for distribution or interconnecting generation sources to the grid.