Alta Substation is an operational electrical substation located in the United States. It operates at a voltage of 69 kV, serving as a node in the regional power grid.

Alta Substation is an operational electrical substation located in the United States, with coordinates 40.813718, -89.658050. The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure. As part of the U.S. electrical grid, it plays a role in stepping down transmission voltages for local distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards and oversee interstate electricity transmission. The 69 kV voltage level is common for sub-transmission and distribution networks, connecting bulk power systems to end users. Equipment typically includes circuit breakers, transformers, and switchgear designed to ensure grid stability and safety. Alta Substation contributes to the electrical infrastructure of the region, supporting residential, commercial, and industrial loads. Its operational status indicates ongoing grid connectivity and maintenance. The facility's location in the United States places it within one of the world's largest interconnected power systems, where reliability and compliance with NERC standards are critical for preventing outages and ensuring efficient power delivery.

Environmental context

The substation is located in a region with a temperate climate, which influences equipment design and maintenance schedules. The 69 kV voltage level suggests it serves a mix of urban and rural areas, with potential impacts on local land use and wildlife corridors. Substations of this scale typically have minimal direct environmental footprint but require careful management of insulating fluids and electromagnetic fields to comply with environmental regulations.

Frequently asked questions

Alta Substation is located in the United States at coordinates 40.813718, -89.658050.

Alta Substation operates at a voltage of 69 kV, which is typical for sub-transmission and distribution networks.

Alta Substation is currently operational, indicating it is active and connected to the power grid.

As a U.S. substation, Alta Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 69 kV substation typically steps down transmission voltages for local distribution, serving residential, commercial, and industrial customers.