Alvey Substation is an operational electrical substation in the United States, handling voltages of 500 kV and 230 kV. It plays a key role in regional grid stability and power transmission.

Alvey Substation is an operational electrical substation located in the United States, with coordinates 43.996555, -123.016147. The facility operates at high voltage levels of 500 kV and 230 kV, indicating its critical role in long-distance power transmission and grid interconnection. As a substation, it serves as a node for voltage transformation and power distribution, supporting the reliability of the electrical grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. The voltage levels suggest that Alvey Substation is a major transmission asset, likely connecting high-voltage lines to lower-voltage distribution networks. Such facilities are essential for maintaining grid stability and ensuring efficient power flow across regions. Alvey Substation's operational status and voltage capacity contribute to the resilience of the local electrical infrastructure. Its location in the United States places it within a well-regulated environment with stringent reliability requirements. The substation supports community energy needs and facilitates the integration of diverse power sources, enhancing the overall efficiency and security of the regional power grid.

Environmental context

The substation's location in the United States, with a temperate climate, influences its design for seasonal load variations. High-voltage equipment requires robust insulation and cooling systems to handle thermal stress. The facility's rural or suburban setting may reduce direct environmental impact, but its role in grid stability supports renewable energy integration and reduces reliance on less efficient local generation.

Frequently asked questions

Alvey Substation is located in the United States at coordinates 43.996555, -123.016147.

Alvey Substation operates at 500 kV and 230 kV, making it a high-voltage transmission substation.

Alvey Substation is currently operational, serving as an active node in the electrical grid.

As a US substation, Alvey Substation must comply with NERC reliability standards and FERC regulations for bulk power systems.

Substations like Alvey transform voltage levels, switch circuits, and ensure reliable power transmission between generation sources and distribution networks.