Substation Operational

Amelia Earhart Substation - Operational Substation in the United States

United States

Overview

Amelia Earhart Substation is an operational substation in the United States, owned and operated by Evergy. It handles voltages of 115 kV and 12 kV, serving the regional power grid.

Amelia Earhart Substation is an operational electrical substation located in the United States, owned and operated by Evergy. The facility handles transmission-level voltage of 115 kV and distribution-level voltage of 12 kV, indicating its role in stepping down power for local distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As part of Evergy's network, it likely incorporates modern substation automation technologies such as IEC 61850 for efficient monitoring and control. This substation plays a key role in maintaining grid stability and reliability in its service area. Its location in the central United States places it within a region that experiences variable weather conditions, requiring robust infrastructure to ensure continuous power supply to residential, commercial, and industrial customers.

Environmental context

The substation is situated in a rural area of the central United States, where the surrounding landscape is primarily agricultural. The facility's design and operation must consider local environmental factors such as potential impacts on farmland and wildlife. Proper insulation and maintenance of switchgear are essential to prevent outages that could affect the local community.

Frequently asked questions

Amelia Earhart Substation is located in the United States, with coordinates approximately 39.556742, -95.118402.

The substation handles transmission voltage of 115 kV and distribution voltage of 12 kV.

The substation is owned and operated by Evergy, a major electric utility company in the United States.

As part of the US power grid, the substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.

Substations like Amelia Earhart step down high-voltage electricity from transmission lines to lower voltages for local distribution, ensuring reliable power delivery to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector