Overview
Apac Substation is an operational electrical substation in Georgia, United States, owned and operated by Georgia Power. It operates at voltage levels of 46 kV and 12 kV, serving the local grid.
Apac Substation is an operational electrical substation located in Georgia, United States. Owned and operated by Georgia Power, a major utility in the region, the facility plays a role in the state's electrical infrastructure. The substation operates at voltage levels of 46 kV and 12 kV, indicating its function in both sub-transmission and distribution networks. As part of the U.S. electrical grid, Apac Substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure reliability and security of the bulk power system. The substation likely employs modern automation and protection systems, such as those based on the IEC 61850 standard, to enhance grid stability and operational efficiency. The substation's location in Georgia supports the state's growing energy demands, driven by industrial, commercial, and residential sectors. Its role in voltage transformation and power distribution is critical for maintaining grid reliability in the region. The facility contributes to the overall resilience of the electrical infrastructure in the southeastern United States.
Environmental context
The substation is situated in a region characterized by a humid subtropical climate, with hot summers and mild winters. Its location in a rural or suburban area of Georgia minimizes direct environmental impact, though the facility's operation involves electromagnetic fields and potential oil spill risks from transformers. The surrounding landscape includes mixed forests and agricultural land, which may be sensitive to infrastructure development. Proper siting and maintenance practices help mitigate ecological disruption.
Frequently asked questions
Apac Substation is located in Georgia, United States, at coordinates 33.474239, -82.639708. It is owned and operated by Georgia Power.
Apac Substation operates at voltage levels of 46 kV and 12 kV, indicating its role in sub-transmission and distribution networks.
Apac Substation is owned and operated by Georgia Power, a major electric utility serving the state of Georgia.
As part of the U.S. electrical grid, Apac Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
Substations like Apac transform voltage levels and route electricity between transmission and distribution systems, playing a critical role in delivering reliable power to consumers.