Overview
Arena Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a role in regional grid stability and power distribution.
Arena Substation is an operational electrical substation located in the United States, with coordinates 32.223634, -102.677536. The facility operates at a voltage of 138 kV, classifying it as a high-voltage substation within the transmission network. This voltage level is typical for sub-transmission or transmission applications, supporting the distribution of electricity from generation sources to local distribution networks. The substation operates under the regulatory framework of the United States, which includes compliance with NERC reliability standards and FERC regulations for transmission-level assets. As a 138 kV facility, it is subject to mandatory reliability standards to ensure grid stability and prevent cascading outages. The infrastructure likely includes modern switchgear and protection systems to maintain operational safety and efficiency. Located in a region with coordinates indicating a rural or semi-urban area in Texas, the substation serves as a critical node in the local electrical grid. Its operational status ensures continued power supply to surrounding communities and industries. The facility's role in voltage regulation and load balancing contributes to the overall resilience of the regional power system.
Environmental context
The substation is situated in a region characterized by semi-arid climate and flat terrain, typical of the Texas plains. The 138 kV voltage level indicates its role in transmitting power over moderate distances, potentially connecting renewable energy sources like wind farms to the grid. The facility's location away from dense urban areas reduces direct environmental impact, but its operation supports the integration of cleaner energy sources, contributing to regional sustainability goals.
Frequently asked questions
Arena Substation is located in the United States at coordinates 32.223634, -102.677536, likely in Texas.
Arena Substation operates at 138 kV, a common voltage for sub-transmission and transmission networks.
Arena Substation is currently operational, meaning it is actively used in the electrical grid.
As a US substation, Arena Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 138 kV substation typically steps down transmission voltage for distribution or interconnects generation sources, playing a key role in regional power delivery.