Risk: Low Substation Operational

Arnold Rec Substation - Operational 115 kV Substation in the United States

United States

Overview

Arnold Rec Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.

Arnold Rec Substation is an operational electrical substation located in the United States, with coordinates 39.850413, -79.081172. The facility operates at a voltage of 115 kV, classifying it as a high-voltage substation that supports transmission and distribution networks. As part of the U.S. electrical infrastructure, it falls under the regulatory oversight of NERC reliability standards and FERC for transmission-level assets. The substation's 115 kV voltage level indicates it serves as a critical node for stepping down power from higher transmission voltages to sub-transmission or distribution levels. In the U.S., substations of this scale are typically equipped with switchgear, transformers, and protection systems compliant with IEEE and ISO/IEC 61850 standards for automation and communication. The facility's operational status suggests it is actively maintained to ensure grid reliability. Located in a rural area of Pennsylvania, the substation likely supports local communities and industries by providing stable electrical supply. Its role in the grid contributes to the resilience of the regional power system, especially during peak demand or contingency events. The facility's environmental context involves managing electromagnetic fields and ensuring safe operation near natural habitats, though specific ecological impacts are minimized through standard engineering practices.

Environmental context

The substation is situated in a rural area of Pennsylvania, where the surrounding landscape includes forests and agricultural land. The 115 kV voltage level and operational status indicate standard environmental management practices, such as vegetation control and stormwater management, to minimize ecological disruption. The facility's location away from dense urban centers reduces exposure to sensitive receptors, while its role in grid stability supports efficient power transmission, indirectly contributing to reduced emissions by enabling renewable energy integration.

Frequently asked questions

Arnold Rec Substation is located in the United States at coordinates 39.850413, -79.081172, in a rural area of Pennsylvania.

Arnold Rec Substation operates at a voltage of 115 kV, which is typical for high-voltage substations that serve as intermediate nodes in the transmission grid.

Arnold Rec Substation is currently operational, meaning it is actively used to manage and distribute electrical power within the regional grid.

Substations in the United States must comply with NERC reliability standards for grid stability and FERC regulations for transmission assets. Additionally, automation systems often follow the ISO/IEC 61850 standard.

A 115 kV substation typically steps down power from higher transmission voltages (e.g., 230 kV or 500 kV) to sub-transmission or distribution levels, ensuring reliable electricity supply to local communities and industries.
UtilityRadar
More
Press Esc to close · Browse by sector