Overview
Arthur Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Arthur Substation is an operational electrical substation located in the United States, with coordinates 41.567963, -101.683637. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of regional distribution networks. As part of the U.S. electrical infrastructure, it supports the transmission and distribution of electricity to local communities and industries. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. The 115 kV voltage level is common for sub-transmission and distribution, connecting higher-voltage transmission lines to local distribution networks. The facility's location in a rural area of the United States suggests it serves agricultural or small community loads. Arthur Substation contributes to the reliability and resilience of the regional power grid. Its operational status ensures continued electricity supply to the surrounding area, supporting local economic activities and daily life. The substation's role in the electrical infrastructure is critical for maintaining voltage stability and load balancing within the interconnected power system.
Environmental context
The substation is located in a rural area of the United States, characterized by agricultural land and low population density. The environmental context includes potential impacts from electromagnetic fields and land use for infrastructure. The facility's operation aligns with grid reliability standards, and its rural location minimizes direct environmental footprint compared to urban substations.
Frequently asked questions
Arthur Substation is located in the United States at coordinates 41.567963, -101.683637, in a rural area.
Arthur Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution networks.
Arthur Substation operates under the regulatory oversight of NERC and FERC, which enforce reliability standards for the U.S. bulk power system.
A 115 kV substation steps down transmission-level voltage for distribution to local networks, ensuring reliable electricity supply to communities and industries.
Arthur Substation helps maintain voltage stability and load balancing within the regional grid, supporting continuous power delivery to the surrounding area.