Overview
Atlas Substation is an operational electrical substation in Michigan, United States, owned and operated by DTE Energy. It handles voltages of 40,000 V and 4,800 V, serving the local grid.
Atlas Substation is an operational electrical substation located in Michigan, United States. Owned and operated by DTE Energy, the facility is part of the regional transmission and distribution network, stepping down high-voltage electricity for local distribution. The substation handles voltages of 40,000 V and 4,800 V, indicating it serves both sub-transmission and distribution functions. As a substation in the United States, Atlas Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, ensuring grid stability and security. DTE Energy, as the owner and operator, complies with these standards to maintain safe and reliable service. The substation plays a critical role in the local electrical infrastructure, supporting residential, commercial, and industrial customers in the region. Its location in Michigan, a state with a diverse industrial base, underscores its importance in maintaining power quality and reliability. The facility's operational status ensures continued service to the community.
Environmental context
Atlas Substation is situated in a mixed urban and suburban area of Michigan, near the Detroit metropolitan region. The local environment includes residential neighborhoods and industrial zones, requiring careful management of electromagnetic fields and noise. The substation's design likely incorporates measures to minimize visual impact and ensure safe operation within the community.
Frequently asked questions
Atlas Substation is located in Michigan, United States, at coordinates 42.184320, -83.198619, near the Detroit metropolitan area.
Atlas Substation is owned and operated by DTE Energy, a major utility company serving Michigan.
Atlas Substation handles voltages of 40,000 V (40 kV) and 4,800 V (4.8 kV), indicating it serves both sub-transmission and distribution functions.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability and security. Facilities like Atlas Substation are subject to these requirements.
Substations like Atlas step down high-voltage electricity from transmission lines to lower voltages for local distribution, ensuring safe and reliable power delivery to homes and businesses.