Risk: Low Substation Operational

Bard Road Substation: ITC-Owned Electrical Substation in Michigan

United States

Overview

Bard Road Substation is an operational electrical substation in Michigan, United States, owned and operated by ITC. It operates at 138 kV and 46 kV, serving the regional grid.

Bard Road Substation is an operational electrical substation located in Michigan, United States. Owned and operated by ITC, this facility plays a key role in the regional transmission network, stepping down voltage from 138 kV to 46 kV for local distribution. As part of the U.S. electrical infrastructure, Bard Road Substation operates under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) and adheres to North American Electric Reliability Corporation (NERC) reliability standards. The substation's dual voltage levels indicate its function as a transmission-to-distribution interface, typical of medium-scale substations supporting grid stability in rural or suburban areas. The substation's location in Michigan places it within the Eastern Interconnection, one of the major synchronous grids in North America. Its operational status ensures continued reliability for local communities and industries, contributing to the overall resilience of the regional power system.

Environmental context

The substation is situated in a rural area of Michigan, where the surrounding landscape includes mixed forests and agricultural land. Electrical infrastructure like Bard Road Substation is designed to minimize environmental impact through proper siting and maintenance, with considerations for electromagnetic fields and wildlife protection. The facility's voltage levels and operational practices align with standard environmental mitigation measures for substations in the region.

Frequently asked questions

Bard Road Substation is located in Michigan, United States, at coordinates 44.036063, -84.587514.

Bard Road Substation is owned and operated by ITC, a major electricity transmission company in the United States.

Bard Road Substation operates at two voltage levels: 138 kV (transmission) and 46 kV (sub-transmission/distribution).

As part of the U.S. grid, Bard Road Substation must comply with NERC reliability standards and FERC regulations for transmission assets.

Substations like Bard Road step down high transmission voltages to lower distribution voltages, ensuring safe and reliable electricity delivery to homes and businesses.