Overview
Baumhart Substation is an operational electrical substation in Ohio, United States, owned and operated by FirstEnergy. It handles voltages of 69 kV and 12.47 kV.
Baumhart Substation is an operational electrical substation located in Ohio, United States. Owned and operated by FirstEnergy, a major utility in the region, the facility plays a key role in the local power distribution network. The substation is part of the larger grid infrastructure serving residential, commercial, and industrial customers in the area. The substation operates at voltage levels of 69,000 volts (69 kV) and 12,470 volts (12.47 kV), indicating it functions as a step-down substation that connects transmission-level power to distribution networks. As part of the US electrical grid, it adheres to NERC reliability standards and FERC regulations for transmission-level assets. The facility's location in Ohio places it within the PJM Interconnection regional transmission organization, which coordinates the movement of wholesale electricity. Baumhart Substation contributes to grid stability and reliability in its service area. Its operational status ensures continuous power supply to local communities and businesses. The substation's design and maintenance follow industry standards for substation automation and safety, supporting the efficient distribution of electricity across the region.
Environmental context
The substation is located in a region with a mix of urban and rural areas, typical of northern Ohio. The local environment includes agricultural land and small communities, with the substation's footprint being relatively small. The facility's operation involves electromagnetic fields and potential oil containment from transformers, managed under environmental regulations. Its location near Lake Erie influences weather patterns, requiring robust infrastructure to withstand winter storms and high winds.
Frequently asked questions
Baumhart Substation is located in Ohio, United States, at coordinates 41.427381, -82.297575. It is owned and operated by FirstEnergy.
Baumhart Substation operates at 69,000 volts (69 kV) and 12,470 volts (12.47 kV), serving as a step-down substation between transmission and distribution networks.
Baumhart Substation is owned and operated by FirstEnergy, a major electric utility serving customers in Ohio and other states.
As part of the US electrical grid, Baumhart Substation must comply with NERC reliability standards and FERC regulations. It operates within the PJM Interconnection regional transmission organization.
Substations like Baumhart transform voltage levels and route electricity to ensure reliable power delivery. They are critical for grid stability and connecting generation sources to end users.