Beaver Road Substation is an operational electrical substation in Georgia, United States, operated by Georgia Power. It operates at a voltage of 115 kV, serving the local grid.

Beaver Road Substation is an electrical substation located in Georgia, United States, operated by Georgia Power. The facility is operational and plays a role in the regional transmission network, stepping down high-voltage electricity for distribution. Operating at 115 kV, this substation is part of the medium-voltage transmission infrastructure typical of the U.S. Southeast. As a Georgia Power asset, it falls under the regulatory oversight of the Georgia Public Service Commission and must comply with NERC reliability standards for grid stability and FERC regulations for interstate transmission. The substation supports the electrical needs of the Augusta area, contributing to grid reliability and local power distribution. Its location near residential and commercial zones underscores its importance in maintaining consistent electricity supply to the community.

Environmental context

Located in a suburban area of Georgia, the substation's environmental context includes proximity to residential neighborhoods and potential electromagnetic field considerations. The facility's design and operation adhere to NERC standards to minimize environmental impact, including noise and visual intrusion. Vegetation management around the site helps maintain clearances and reduce wildfire risk.

Frequently asked questions

Beaver Road Substation is located in Georgia, United States, near Augusta. Its coordinates are approximately 33.4715° N, -82.0813° W.

Beaver Road Substation operates at a voltage of 115 kV, which is a common medium-voltage level for subtransmission and distribution substations in the United States.

Beaver Road Substation is operated by Georgia Power, a major electric utility serving the state of Georgia and a subsidiary of Southern Company.

Substations in the United States must comply with NERC reliability standards for grid stability and FERC regulations for transmission-level assets. Georgia Power also follows state-level regulations from the Georgia Public Service Commission.

A 115 kV substation typically steps down high-voltage transmission power (e.g., 230 kV or higher) to lower voltages for local distribution, serving industrial, commercial, and residential customers. It also provides switching and protection functions to maintain grid reliability.