Substation Operational

Bethlehem Station 21 - National Grid 115 kV Substation in Bethlehem, New York

United States

Overview

Bethlehem Station 21 is a 115 kV substation operated by National Grid in Bethlehem, New York, United States. It plays a key role in the regional electrical grid.

Bethlehem Station 21 is a substation located in Bethlehem, New York, United States, operated by National Grid. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure in the region. As part of National Grid's network, this substation is subject to North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) regulations for transmission-level assets. The 115 kV voltage level is commonly used for subtransmission and distribution, serving local communities and industrial areas. The substation's operational status is active, contributing to grid stability and power delivery in the Capital District of New York. Its location in a suburban area underscores its role in supporting residential and commercial electricity demand.

Environmental context

The substation is situated in a suburban area of Bethlehem, New York, within the Hudson Valley region. The local environment includes mixed residential and commercial land use, with proximity to the Normans Kill river. Substations at this voltage level typically have a small physical footprint and minimal direct environmental impact, though they are critical for integrating renewable energy sources and maintaining grid reliability.

Frequently asked questions

Bethlehem Station 21 is located in Bethlehem, New York, United States, at coordinates 42.602903, -73.799688.

Bethlehem Station 21 operates at a voltage of 115 kV, which is typical for subtransmission and distribution substations.

Bethlehem Station 21 is operated by National Grid, a major utility company serving the northeastern United States.

As part of the US electrical grid, this substation must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.

A 115 kV substation typically steps down voltage from higher transmission levels for distribution to local areas, ensuring reliable power delivery to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector