Overview
Big Eddy Substation is an operational electrical substation in the United States, operating at 500 kV. It plays a critical role in high-voltage transmission grid stability.
Big Eddy Substation is an operational electrical substation located in the United States, with coordinates 45.603668, -121.107979. It operates at a voltage of 500 kV, classifying it as a high-voltage transmission facility critical for long-distance power transfer and grid stability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. As a 500 kV facility, it is a key node in the transmission network, likely connecting major generation sources to load centers. The environmental context of Big Eddy Substation includes its location in a rural area of the Pacific Northwest, a region known for hydroelectric power generation. The substation's high voltage level indicates its importance in integrating renewable energy sources and maintaining grid resilience. Its operational status ensures continued support for regional electricity supply.
Environmental context
Big Eddy Substation is situated in a rural area of the Pacific Northwest, a region characterized by significant hydroelectric generation and diverse ecosystems. The 500 kV voltage level indicates its role in long-distance transmission, potentially connecting renewable energy sources to urban centers. The substation's location may intersect with natural habitats, but specific environmental designations are not confirmed.
Frequently asked questions
Big Eddy Substation is located in the United States at coordinates 45.603668, -121.107979, in the Pacific Northwest region.
Big Eddy Substation operates at 500 kV, making it a high-voltage transmission substation critical for long-distance power transfer.
Big Eddy Substation is currently operational, actively serving the electrical grid.
As a US transmission asset, Big Eddy Substation must comply with NERC reliability standards and FERC regulations for bulk power system operation.
500 kV is a high voltage level used for efficient long-distance transmission, reducing losses and enabling bulk power transfer between regions.