Overview
Binary Substation is an operational electrical substation in Tempe, Arizona, owned and operated by Salt River Project. It operates at 69 kV, serving the local grid.
Binary Substation is an operational electrical substation located in Tempe, Arizona, United States. Owned and operated by Salt River Project, it is part of the regional transmission and distribution network. The substation operates at a voltage of 69 kV, which is typical for sub-transmission and distribution-level infrastructure in the United States. As a substation within the Salt River Project system, Binary Substation is subject to North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) regulations for grid stability. The 69 kV voltage level places it in the medium-voltage category, commonly used for distributing power from larger transmission lines to local distribution networks. The facility is located in an urban area of Tempe, supporting residential and commercial electricity demand. The substation plays a key role in maintaining reliable electricity supply to the surrounding community. Its operational status ensures continued grid connectivity and voltage regulation. The Salt River Project, a major utility in Arizona, operates a diverse portfolio of generation and transmission assets, with Binary Substation contributing to the resilience of the local electrical infrastructure.
Environmental context
The substation is situated in an urban environment in Tempe, Arizona, a region characterized by a hot desert climate. The surrounding area includes residential and commercial developments, with the substation's infrastructure designed to withstand high temperatures and occasional monsoon storms. The 69 kV voltage level indicates a role in local distribution, minimizing visual and environmental footprint compared to high-voltage transmission lines. The facility's location in a built-up area aligns with typical urban substation siting, prioritizing proximity to load centers.
Frequently asked questions
Binary Substation is located in Tempe, Arizona, United States, at coordinates 33.411855, -111.969037.
Binary Substation operates at a voltage of 69 kV, which is a common sub-transmission voltage level in the United States.
Binary Substation is owned and operated by Salt River Project, a major utility serving the Phoenix metropolitan area.
As part of the US electrical grid, Binary Substation must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.
A 69 kV substation typically steps down voltage from higher transmission levels for distribution to local networks, serving residential, commercial, and industrial customers.