Overview

Bland Substation #22 CLAY is an operational substation in Florida, United States, operated by Clay Electric Cooperative. It operates at 115 kV, supporting regional grid stability.

Bland Substation #22 CLAY is an operational electrical substation located in Florida, United States, managed by Clay Electric Cooperative. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation that plays a role in local power distribution and transmission. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a cooperative-owned asset, it is part of a network serving rural and suburban communities in north-central Florida. Environmentally, the substation is situated in a region with a humid subtropical climate, where storm resilience is a key operational consideration. Its role in distributing power to residential and agricultural areas underscores its importance to local energy reliability and community service.

Environmental context

Located in north-central Florida, the substation operates in a region prone to thunderstorms and hurricanes, requiring robust infrastructure to maintain grid stability. The surrounding area features a mix of rural and suburban land use, with the substation's 115 kV voltage level supporting local distribution needs without significant environmental footprint from the facility itself.

Frequently asked questions

Bland Substation #22 CLAY is located in Florida, United States, near coordinates 29.950237, -82.506497, in an area served by Clay Electric Cooperative.

Bland Substation #22 CLAY operates at a voltage of 115 kV, which is typical for sub-transmission and distribution substations in the United States.

The substation is operated by Clay Electric Cooperative, a member-owned utility serving parts of north-central Florida.

As part of the U.S. bulk power system, Bland Substation #22 CLAY must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 115 kV substation typically steps down transmission voltage for local distribution or interconnects sub-transmission lines, playing a key role in delivering electricity to communities and industries.