Overview
Blue Summit Wind Substation, operated by NextEra Energy, is a 345 kV substation in Texas, United States. It supports wind energy transmission and grid stability.
Blue Summit Wind Substation is a high-voltage electrical substation located in Texas, United States, operated by NextEra Energy. With a voltage level of 345 kV, it is classified as a transmission-level substation, playing a critical role in the regional power grid. The substation is part of the infrastructure supporting wind energy integration, reflecting the growing renewable energy capacity in the area. As a 345 kV facility, Blue Summit Wind Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure reliability and security for bulk power systems. The substation likely employs modern switchgear and automation systems compliant with ISO/IEC 61850, enhancing operational efficiency and grid stability. The substation's location in Texas, a state with significant wind energy generation, underscores its importance in transmitting renewable power to load centers. By connecting wind farms to the grid, it contributes to reducing carbon emissions and supporting energy transition goals. Its operational status and ownership by a major energy company indicate a well-maintained facility with a focus on reliability.
Environmental context
Located in a region with high wind energy potential, the substation facilitates the integration of renewable energy, reducing reliance on fossil fuels. The surrounding area is characterized by open plains and agricultural land, with minimal urban development. The substation's operation supports local and regional environmental goals by enabling clean energy transmission, though it also requires careful management of electromagnetic fields and land use to minimize ecological impact.
Frequently asked questions
Blue Summit Wind Substation is located in Texas, United States, at coordinates 34.294055, -99.369219.
Blue Summit Wind Substation operates at 345 kV, which is a transmission-level voltage used for bulk power transfer.
The substation is operated by NextEra Energy, a major energy company in the United States.
As a US transmission asset, it must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
The substation connects wind farms to the grid, enabling the transmission of renewable energy and supporting the integration of clean power sources.