Substation Operational

Brickyard "T" Switch CLAY Substation - Florida Electrical Infrastructure

United States

Overview

Brickyard "T" Switch CLAY is a 115 kV substation operated by Clay Electric Cooperative in Florida, United States. It plays a key role in local grid stability and power distribution.

Brickyard "T" Switch CLAY is a substation located in Florida, United States, operated by Clay Electric Cooperative. The facility operates at 115 kV, a standard voltage level for sub-transmission and distribution, indicating a medium-scale substation serving regional power needs. As part of the U.S. electrical infrastructure, this substation operates under NERC reliability standards and FERC regulations, ensuring grid stability and compliance. The 115 kV voltage level is typical for connecting distribution networks to higher-voltage transmission lines, and the facility likely includes switchgear and transformers to manage power flow. The substation supports the local community by providing reliable electricity to residential, commercial, and industrial customers in the Clay Electric Cooperative service area. Its operational status ensures continued grid resilience and power delivery in the region.

Environmental context

Located in Florida, the substation operates in a region prone to hurricanes and severe weather, which can impact grid reliability. The facility's design likely includes weather-resistant infrastructure to mitigate storm-related outages. The surrounding area is a mix of urban and rural development, with the substation's 115 kV voltage level supporting local distribution without significant environmental footprint.

Frequently asked questions

Brickyard T Switch CLAY substation is located in Florida, United States, near coordinates 30.1075, -81.7707.

The substation operates at 115 kV, a common voltage for sub-transmission and distribution networks.

The substation is operated by Clay Electric Cooperative, a member-owned utility serving parts of Florida.

As part of the U.S. grid, the substation must comply with NERC reliability standards and FERC regulations for transmission and distribution.

A 115 kV substation typically steps down voltage from higher transmission lines for local distribution, serving residential and commercial areas.
UtilityRadar
More
Press Esc to close · Browse by sector