Risk: Low Substation Operational

Brocks Mill Substation - Operational 69 kV Electrical Substation in the United States

United States

Overview

Brocks Mill Substation is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional grid stability and power distribution.

Brocks Mill Substation is an operational electrical substation located in the United States, with coordinates 34.756257, -79.995298. The facility operates at a voltage level of 69 kV, which classifies it as a sub-transmission or distribution-level substation, typical for serving local industrial or residential loads. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As a 69 kV facility, it is subject to applicable NERC standards for voltage regulation, protection systems, and maintenance practices. This substation contributes to the electrical infrastructure of the region by stepping down voltage for local distribution or interconnecting generation. Its operational status ensures continued service to the surrounding community, supporting grid resilience and energy delivery.

Environmental context

The substation is located in a rural or semi-rural area of the southeastern United States, where electrical infrastructure supports agricultural, residential, and light industrial activities. The 69 kV voltage level indicates a moderate scale of power handling, with environmental considerations including electromagnetic field management and vegetation clearance for right-of-way maintenance.

Frequently asked questions

Brocks Mill Substation is located in the United States at coordinates 34.756257, -79.995298.

Brocks Mill Substation operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level substations.

Brocks Mill Substation is currently operational, meaning it is actively serving the electrical grid.

As a substation in the United States, Brocks Mill Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 69 kV substation typically steps down transmission-level voltage for local distribution or interconnects smaller generation sources, playing a key role in regional power delivery.
UtilityRadar
More
Press Esc to close · Browse by sector