Risk: Medium Substation Operational

Brook Road Station 369 Substation - National Grid | United States Electrical Infrastructure

United States

Overview

Brook Road Station 369 is a substation operated by National Grid in the United States, handling voltages of 115 kV and 34.5 kV to support regional grid stability.

Brook Road Station 369 is a substation located in the United States, operated by National Grid. It serves as a critical node in the electrical infrastructure, stepping down transmission voltages for local distribution. The facility is operational and plays a key role in maintaining reliable power supply in its region. The substation operates at voltage levels of 115 kV and 34.5 kV, typical for transmission and sub-transmission applications. As part of the US grid, it adheres to NERC reliability standards and FERC regulations, ensuring system stability and compliance with mandatory reliability requirements. The equipment likely includes modern switchgear and protection systems to manage power flow and fault conditions. Environmental considerations for this substation include its location in a mixed urban-rural area, where it supports both residential and commercial loads. The facility's design incorporates standard mitigation measures for electromagnetic fields and noise. Its role in the grid enhances community resilience by providing redundant power pathways and supporting voltage regulation.

Environmental context

The substation is situated in a region with a temperate climate, where seasonal variations influence demand patterns. Its location near residential areas necessitates careful management of noise and visual impact, typically addressed through landscaping and enclosure design. The facility's operation supports grid reliability without significant direct environmental emissions, aligning with modern utility practices for sustainable infrastructure.

Frequently asked questions

Brook Road Station 369 is a substation located in the United States, with coordinates approximately 43.0825° N, 73.8334° W. It is operated by National Grid.

Brook Road Station 369 operates at voltage levels of 115 kV and 34.5 kV, typical for transmission and sub-transmission in the US electrical grid.

The substation is operated by National Grid, a major utility company serving the northeastern United States.

As part of the US bulk power system, Brook Road Station 369 must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

Substations like Brook Road Station 369 transform voltage levels for efficient transmission and distribution, and provide switching, protection, and control functions to maintain grid reliability.
UtilityRadar
More
Press Esc to close · Browse by sector