Carters Dam Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a key role in regional grid stability and power distribution.

Carters Dam Substation is an operational electrical substation located in the United States, with coordinates 34.612368, -84.673798. The facility operates at a voltage level of 230 kV, classifying it as a high-voltage transmission substation critical for bulk power transfer and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission-level assets. As a 230 kV facility, it is typical of medium-to-high voltage substations that interconnect generation sources, such as hydroelectric plants, with the wider transmission network. The substation's location near Carters Dam suggests a role in integrating hydroelectric power into the grid, supporting renewable energy utilization and local energy security. Its operational status ensures continued contribution to the stability and resilience of the regional electrical infrastructure.

Environmental context

The substation is situated in a rural area of Georgia, near Carters Dam, which is a hydroelectric facility. The local environment includes forested terrain and water bodies, where the substation's presence supports clean energy transmission. The 230 kV voltage level indicates a significant role in reducing transmission losses over distance, contributing to efficient energy delivery.

Frequently asked questions

Carters Dam Substation is located in the United States, near Carters Dam in Georgia, at coordinates 34.612368, -84.673798.

Carters Dam Substation operates at 230 kV, which is a high-voltage transmission level used for bulk power transfer across the grid.

Carters Dam Substation likely integrates power from the nearby Carters Dam hydroelectric plant into the transmission network, supporting regional electricity supply and grid stability.

As a US transmission asset, the substation must comply with NERC reliability standards and FERC regulations, ensuring safe and reliable operation of the bulk power system.

Yes, Carters Dam Substation is listed as operational, indicating it is actively serving the electrical grid.