Overview
CF&I East Substation is an operational 230 kV electrical substation in the United States, serving grid stability and power distribution needs in the region.
CF&I East Substation is an operational electrical substation located in the United States, with coordinates 38.239011, -104.600496. The facility operates at a voltage level of 230 kV, classifying it as a high-voltage transmission substation critical for regional grid stability and power distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for bulk power systems. As a 230 kV facility, it plays a key role in transmitting electricity from generation sources to distribution networks, typical of medium-to-large scale substations in the US. Environmental and operational significance of CF&I East Substation lies in its contribution to the resilience of the local electrical grid. By stepping down high-voltage transmission power for distribution, it supports industrial, commercial, and residential consumers in the area. Its location in a region with variable climate conditions underscores the importance of robust infrastructure for maintaining continuous power supply.
Environmental context
The substation is situated in a semi-arid region of the United States, where temperature extremes and occasional severe weather events can impact grid reliability. The 230 kV voltage level indicates its role in long-distance power transmission, which may traverse ecologically sensitive areas. Proper maintenance and vegetation management around the substation are essential to minimize fire risks and ensure operational safety.
Frequently asked questions
CF&I East Substation is located in the United States at coordinates 38.239011, -104.600496.
CF&I East Substation operates at 230 kV, a high-voltage level used for bulk power transmission in the US grid.
CF&I East Substation is currently operational, actively contributing to the electrical grid.
As a US substation, CF&I East Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 230 kV substation steps down high-voltage transmission power for distribution to lower-voltage networks, serving industrial and residential areas.