Overview
Challenger Drive Substation is an operational 115 kV substation owned and operated by Central Maine Power Company in Maine, United States. It plays a key role in regional grid stability.
Challenger Drive Substation is an operational electrical substation located in Maine, United States. Owned and operated by Central Maine Power Company, the facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation that supports local distribution and transmission needs. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for grid stability. As part of Central Maine Power's network, it contributes to the region's electrical infrastructure, which serves a mix of urban and rural communities. This facility is critical for maintaining reliable electricity supply in the area, supporting residential, commercial, and industrial customers. Its operational status and voltage level indicate its importance in the local grid, with potential for integration with renewable energy sources as Maine advances its clean energy goals.
Environmental context
The substation is located in a region with a mix of urban and rural landscapes, where grid stability is essential for supporting local communities and industries. The 115 kV voltage level suggests it serves as a distribution hub, potentially connecting to renewable energy sources like wind and solar, which are growing in Maine. Typical substations in this region are subject to regular maintenance and upgrades to meet evolving environmental and reliability standards.
Frequently asked questions
Challenger Drive Substation is located in Maine, United States, at coordinates 44.069215, -70.186515.
Challenger Drive Substation operates at a voltage of 115 kV, which is typical for medium-voltage substations in distribution networks.
The substation is owned and operated by Central Maine Power Company, a major utility serving the state of Maine.
As part of the U.S. grid, the substation must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.
A 115 kV substation typically steps down high-voltage transmission power for local distribution, serving residential, commercial, and industrial customers while ensuring grid stability.