Substation Operational

Citrus Combined Cycle Substation - High-Voltage Electrical Substation in Florida, USA

United States

Overview

Citrus Combined Cycle Substation is an operational electrical substation in Florida, United States, handling voltages of 500 kV and 230 kV. It plays a key role in regional grid stability and power distribution.

Citrus Combined Cycle Substation is an operational electrical substation located in Florida, United States. The facility operates at high voltage levels of 500 kV and 230 kV, indicating its critical role in the transmission network. As a substation, it serves as a node for stepping down or distributing electricity from generation sources to local grids. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. In Florida, the grid is managed by the Florida Reliability Coordinating Council (FRCC), ensuring compliance with NERC standards. The voltage levels suggest this substation is part of the high-voltage transmission system, connecting large power plants to distribution networks. The facility's location in Florida places it within a region prone to hurricanes and extreme weather, which poses operational challenges for grid infrastructure. Substations like Citrus Combined Cycle are essential for maintaining power supply to residential, commercial, and industrial customers, and their reliability is critical for the state's energy security.

Environmental context

The substation is located in a region of Florida with a subtropical climate, where high temperatures and humidity can affect equipment performance. The area is also subject to hurricane risks, which can cause physical damage to overhead lines and substation components. The facility's voltage level and criticality to grid stability mean that any disruption could have cascading effects on the local power supply. Proper maintenance and adherence to NERC reliability standards are essential to mitigate these environmental risks.

Frequently asked questions

Citrus Combined Cycle Substation is located in Florida, United States, near coordinates 28.964282, -82.672711.

The substation operates at 500 kV and 230 kV, indicating its role in high-voltage transmission.

The substation is currently operational.

The substation must comply with NERC reliability standards and FERC regulations for transmission-level assets in the United States.

As a high-voltage substation, it is critical for grid stability and power distribution in Florida, connecting generation sources to the local network.