Risk: Low Substation Operational

Claim Jumper Substation - 230 kV Electrical Substation in Wyoming, United States

United States

Overview

Claim Jumper Substation is an operational electrical substation in Wyoming, United States, operating at 230 kV. It plays a role in regional grid stability and power distribution.

Claim Jumper Substation is an operational electrical substation located in Wyoming, United States. The facility operates at a voltage of 230 kV, classifying it as a high-voltage transmission substation critical for long-distance power transfer and grid interconnection. Its location in a rural area of Wyoming supports the regional energy infrastructure, connecting generation sources to load centers. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for bulk power systems. As a 230 kV facility, it is typical for transmission-level assets in the United States, often serving as a node in the Western Interconnection. The substation's design likely incorporates standard automation and protection systems aligned with industry practices. Environmentally, the substation is situated in a semi-arid region of Wyoming, characterized by open rangeland and minimal urban development. Its operation supports the local economy by facilitating electricity delivery to industrial and residential customers. The facility's grid role contributes to the resilience of the regional power system, particularly during peak demand periods or extreme weather events common to the area.

Environmental context

The substation is located in a rural area of Wyoming with a semi-arid climate, where electrical infrastructure supports energy-intensive industries such as mining and agriculture. The 230 kV voltage level indicates its role in bulk power transmission, which can have localized environmental impacts during construction and maintenance, such as land disturbance and electromagnetic field considerations. However, the facility's operation is integrated into the broader grid, minimizing additional ecological footprint.

Frequently asked questions

Claim Jumper Substation is located in Wyoming, United States, at coordinates 43.389776, -106.322650.

Claim Jumper Substation operates at 230 kV, which is a high-voltage transmission level used for long-distance power transfer.

As part of the US bulk power system, the substation is regulated by NERC reliability standards and FERC for transmission-level assets.

The substation is currently operational, supporting the regional electrical grid in Wyoming.

A 230 kV substation serves as a critical node for transmitting electricity over long distances, stepping down voltage for distribution or interconnecting generation sources.