Overview
Clarkston Substation is an operational electrical substation in the United States, operating at 40 kV. It plays a role in regional grid stability and power distribution.
Clarkston Substation is an operational electrical substation located in the United States, with coordinates 42.743822, -83.420056. The facility operates at a voltage of 40 kV, placing it in the medium-voltage range typical for distribution substations that serve local communities and industrial areas. As a substation in the United States, Clarkston Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, ensuring that substations like this one maintain grid stability and safety. The 40 kV voltage level suggests it is part of the sub-transmission or distribution network, stepping down power from higher transmission voltages for local use. The substation's location in Michigan, near Clarkston, indicates it serves a suburban or rural area, contributing to the reliability of electricity supply for residential and commercial customers. Its operational status confirms it is actively supporting the regional grid, and its role in the electrical infrastructure is critical for maintaining consistent power delivery to the surrounding community.
Environmental context
The substation is situated in a region with a temperate climate, where seasonal weather variations can impact grid operations. Its location in a suburban area near Clarkston, Michigan, means it is subject to typical environmental considerations such as vegetation management to prevent outages and storm resilience measures. The 40 kV voltage level indicates it is a distribution substation, which is less environmentally intrusive than high-voltage transmission lines but still requires careful siting to minimize local ecological disruption.
Frequently asked questions
Clarkston Substation is located in the United States, near Clarkston, Michigan, at coordinates 42.743822, -83.420056.
Clarkston Substation operates at a voltage of 40 kV, which is typical for a distribution substation in the sub-transmission network.
Substations in the US are typically operated by local utilities or regional transmission organizations.
As a US substation, Clarkston Substation must comply with NERC reliability standards and FERC regulations, which ensure grid stability and safety.
A 40 kV substation typically steps down voltage from higher transmission levels for distribution to local areas, serving residential, commercial, and industrial customers.