Clay Lick Substation is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional power distribution and grid stability.
Clay Lick Substation is an operational electrical substation located in the United States, with coordinates 37.902838, -84.856131. The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure. As part of the U.S. electrical grid, it supports local power delivery and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. While 69 kV is below typical transmission voltages, it is common for sub-transmission or distribution systems. The facility's age and specific equipment are not detailed, but standard substation automation may follow IEEE or IEC protocols. The environmental context of Clay Lick Substation includes its rural or semi-rural location, which influences grid stability and maintenance needs. The substation contributes to community service by stepping down voltage for local distribution, supporting residential and commercial loads. Its operational status ensures continued grid connectivity in the region.
Environmental context
The substation is located in a rural area of Kentucky, where the local grid supports agricultural and residential loads. The 69 kV voltage level is typical for sub-transmission, balancing capacity and safety. Standard maintenance practices apply to ensure reliability in the region's climate.
Frequently asked questions
Clay Lick Substation is located in the United States at coordinates 37.902838, -84.856131, likely in Kentucky.
Clay Lick Substation operates at 69 kV, a medium voltage level used for sub-transmission and distribution.
Clay Lick Substation is operational, meaning it is actively serving the electrical grid.
U.S. substations must comply with NERC reliability standards and FERC regulations, ensuring grid stability and safety.
A 69 kV substation typically steps down voltage from transmission lines to distribution levels, serving local communities and industries.