Overview
Cloverbank Substation is an operational electrical substation in New York, United States, owned and operated by National Grid. It operates at a voltage of 115 kV, serving the local grid.
Cloverbank Substation is an operational electrical substation located in New York, United States. Owned and operated by National Grid, the facility plays a key role in the regional power distribution network. With a voltage level of 115 kV, it is classified as a medium-voltage substation, typical for sub-transmission and distribution applications. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As part of National Grid's infrastructure, it adheres to NERC's Critical Infrastructure Protection (CIP) standards and FERC's regulations for transmission-level assets. The 115 kV voltage level is common for distributing power from higher-voltage transmission lines to local distribution networks. Cloverbank Substation contributes to grid stability and reliability in the region by stepping down voltage for local distribution. Its location in New York places it within a densely populated area with high electricity demand, making its operational status critical for maintaining service continuity. The facility supports National Grid's commitment to providing safe and reliable electricity to customers in the state.
Environmental context
The substation is located in a region with a temperate climate, where seasonal weather variations can impact grid operations. Its urban setting means it is subject to local environmental regulations regarding noise and electromagnetic fields. The facility's design likely includes measures to minimize environmental impact, such as oil containment systems for transformers and wildlife protection protocols.
Frequently asked questions
Cloverbank Substation is located in New York, United States, at coordinates 42.746326, -78.892919.
Cloverbank Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution substations.
Cloverbank Substation is owned and operated by National Grid, a major utility company serving the northeastern United States.
As part of the US bulk power system, Cloverbank Substation must comply with NERC reliability standards and FERC regulations, including Critical Infrastructure Protection (CIP) requirements.
A 115 kV substation typically steps down voltage from higher transmission levels (e.g., 230 kV or 345 kV) for distribution to local networks, serving industrial, commercial, and residential customers.