Overview
Clovis Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Clovis Substation is an operational electrical substation located in the United States, with coordinates 34.389482, -103.161216. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure in the US grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. As a 115 kV facility, it likely serves as a distribution substation stepping down power from higher transmission voltages to local distribution networks, supporting residential, commercial, and industrial loads in the surrounding area. The operational status of Clovis Substation indicates it is currently active and contributing to the electrical infrastructure of the region. Its location in a rural area of the US suggests it may serve agricultural or small community power needs, with typical switchgear and protection systems compliant with NERC standards for reliability and grid stability.
Environmental context
The substation is situated in a rural area of the United States, where electrical infrastructure supports agricultural operations and small communities. The 115 kV voltage level indicates a distribution role, with potential environmental considerations including electromagnetic field management and land use for transmission corridors. Typical substations in such settings are designed to minimize ecological impact through proper siting and maintenance.
Frequently asked questions
Clovis Substation is located in the United States at coordinates 34.389482, -103.161216, in a rural area likely serving agricultural and small community power needs.
Clovis Substation operates at 115 kV, which is a medium-voltage level typical for distribution substations in the US electrical grid.
Clovis Substation is currently operational, meaning it is actively involved in the transmission and distribution of electrical power.
As a US electrical substation, Clovis Substation operates under NERC reliability standards and FERC regulations, ensuring grid stability and compliance with federal oversight.
A 115 kV substation typically steps down higher transmission voltages for local distribution, serving residential, commercial, and industrial customers in its area.