Overview
Cobb Hospital Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a key role in regional grid stability and power distribution.
Cobb Hospital Substation is an operational electrical substation located in the United States, with coordinates 33.857674, -84.608316. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure serving urban and suburban areas. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for grid stability. As a 115 kV facility, it likely utilizes modern switchgear and automation systems, potentially adhering to IEC 61850 standards for substation automation. This substation provides critical electrical infrastructure to support local healthcare facilities and surrounding communities. Its operational status ensures reliable power supply, contributing to the resilience of the regional grid. The facility's location in a populated area underscores its importance in maintaining continuous electricity service.
Environmental context
The substation is situated in a suburban area near Cobb County, Georgia, where urban development and healthcare facilities demand reliable power. The 115 kV voltage level indicates a distribution role, with potential environmental considerations including electromagnetic fields and land use. Typical substations in this region incorporate modern insulation and monitoring to minimize environmental impact.
Frequently asked questions
Cobb Hospital Substation is located in the United States at coordinates 33.857674, -84.608316, near Cobb County, Georgia.
Cobb Hospital Substation operates at 115 kV, a medium-voltage level commonly used for distribution to urban and suburban areas.
Cobb Hospital Substation is currently operational, indicating it is actively serving the electrical grid.
As a US substation, Cobb Hospital Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 115 kV substation typically steps down transmission voltage for distribution to local networks, serving hospitals, businesses, and residential areas.