Overview
Cole Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Cole Substation is an operational electrical substation located in the United States, with coordinates 36.616942, -100.846185. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical for regional power distribution and transmission support. As a substation in the United States, Cole Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, ensuring grid stability and security. The 115 kV voltage level is common for subtransmission systems that connect distribution networks to higher-voltage transmission lines. The substation's location in a rural area of the United States suggests it serves local communities and possibly agricultural or industrial loads. Its operational status indicates ongoing contribution to the electrical infrastructure, supporting reliable power delivery in the region.
Environmental context
The substation is situated in a rural area of the United States, characterized by open plains and agricultural land. The environmental context for electrical infrastructure in such regions often involves considerations for wildlife corridors and land use. The 115 kV voltage level indicates a moderate scale, with typical environmental impacts limited to electromagnetic fields and land footprint. The facility's age and specific environmental measures are not detailed, but standard practices include vegetation management and oil containment for transformers.
Frequently asked questions
Cole Substation is located in the United States at coordinates 36.616942, -100.846185, in a rural area.
Cole Substation operates at a voltage of 115 kV, which is typical for subtransmission and distribution support.
Cole Substation is currently operational, actively contributing to the electrical grid.
As a US substation, Cole Substation must comply with NERC reliability standards and FERC regulations for grid stability and security.
A 115 kV substation typically steps down voltage from higher transmission lines for distribution to local networks, serving as a critical node for regional power delivery.