Overview
Coliseum Substation is an operational electrical substation in San Antonio, Texas, owned and operated by CPS Energy. It operates at 138 kV, serving the local grid.
Coliseum Substation is an operational electrical substation located in San Antonio, Texas, United States. Owned and operated by CPS Energy, the facility plays a key role in the regional power distribution network. As a 138 kV substation, it is classified as a high-voltage transmission-level asset, supporting the stability and reliability of the local grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. CPS Energy, as a municipally owned utility, adheres to these standards to ensure safe and consistent electricity delivery. The 138 kV voltage level is typical for sub-transmission and distribution substations in the United States, facilitating power flow from higher-voltage transmission lines to lower-voltage distribution networks. Located in an urban area of San Antonio, Coliseum Substation contributes to the city's electrical infrastructure resilience. Its operational status and integration with CPS Energy's grid underscore its importance in meeting the electricity demands of residential, commercial, and industrial customers. The facility's role in voltage regulation and grid stability is critical for maintaining reliable power supply in the region.
Environmental context
The substation is situated in an urban environment in San Antonio, where electrical infrastructure must balance reliability with land use constraints. The 138 kV voltage level indicates a moderate environmental footprint, as substations of this scale typically require cleared land and may involve oil-filled equipment. Proximity to residential and commercial areas necessitates adherence to safety and noise regulations. The local climate, with hot summers and occasional thunderstorms, influences maintenance and operational practices to ensure grid stability.
Frequently asked questions
Coliseum Substation is located in San Antonio, Texas, United States, at coordinates 29.432626, -98.444339.
Coliseum Substation operates at 138 kV, which is a high-voltage level typical for sub-transmission and distribution substations in the United States.
Coliseum Substation is owned and operated by CPS Energy, a municipally owned utility serving the San Antonio area.
As part of the US bulk power system, Coliseum Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and safety.
A 138 kV substation steps down transmission-level voltage for distribution to local networks, playing a critical role in voltage regulation and reliable electricity delivery to end users.