Risk: Medium Substation Operational

College Lake Substation - Operational Electrical Substation in Colorado, United States

United States

Overview

College Lake Substation is an operational electrical substation in Colorado, operated by Public Service Company of Colorado. It handles voltages of 230 kV and 13.8 kV, supporting regional grid stability.

College Lake Substation is an operational electrical substation located in Colorado, United States. Operated by Public Service Company of Colorado, it serves as a key node in the regional transmission and distribution network. The facility handles high-voltage (230 kV) and medium-voltage (13.8 kV) power, indicating its role in both bulk power transmission and local distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the U.S. grid. As part of the Public Service Company of Colorado's infrastructure, it supports the state's growing energy demands, including renewable integration and load balancing. Environmentally, the substation is located in a region with varied terrain and climate, which can influence grid operations. Its voltage levels and operational status suggest it plays a critical role in maintaining grid stability for surrounding communities. The facility's design and maintenance align with industry standards for substation automation and safety.

Environmental context

The substation is situated in Colorado, a state with diverse geography including mountains and plains. The local climate features cold winters and hot summers, which can affect equipment performance and demand patterns. The facility's voltage levels (230 kV and 13.8 kV) indicate its importance for both long-distance transmission and local distribution, contributing to grid resilience in the region.

Frequently asked questions

College Lake Substation is located in Colorado, United States, at coordinates 40.582312, -105.144276.

College Lake Substation operates at 230 kV and 13.8 kV, handling both high-voltage transmission and medium-voltage distribution.

College Lake Substation is operated by Public Service Company of Colorado, a utility serving the region.

As part of the U.S. grid, College Lake Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.

Substations like College Lake step voltage up or down for efficient transmission and distribution, ensuring reliable electricity supply to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector