Risk: Low Substation Operational

Community Wind North Project Collector Substation - US Wind Energy Substation

United States

Overview

Community Wind North Project Collector Substation is an operational substation in the United States, operating at 34.5 kV to support wind energy transmission.

Community Wind North Project Collector Substation is an operational electrical substation located in the United States, with coordinates 44.282341, -96.420036. It serves as a collector substation for wind energy, stepping up voltage for grid integration. The facility operates at 34.5 kV, a typical voltage level for medium-scale renewable energy collection. As a substation in the United States, this facility operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for transmission-level assets, ensuring grid stability and compliance with mandatory standards. The substation likely employs IEC 61850 for substation automation, a common standard for communication and control. The substation plays a critical role in connecting renewable wind energy to the broader electrical grid, supporting the transition to cleaner energy sources. Its location in a rural area of the United States is typical for wind farm collector substations, which aggregate power from multiple turbines before transmission to the main grid. This facility contributes to regional energy resilience and renewable energy goals.

Environmental context

The substation is located in a rural area of the United States, typical for wind energy projects. Its operation at 34.5 kV indicates a medium-voltage collector system, which is standard for aggregating wind power. The facility's environmental context includes supporting renewable energy generation, which reduces greenhouse gas emissions compared to fossil fuel sources. The substation's design and operation must comply with environmental regulations to minimize impacts on local ecosystems.

Frequently asked questions

The substation is located in the United States at coordinates 44.282341, -96.420036, in a rural area typical for wind energy projects.

The substation operates at 34.5 kV, a standard voltage level for collector substations in wind energy projects.

A collector substation aggregates power from multiple wind turbines and steps up the voltage for transmission to the main grid, enabling efficient long-distance power delivery.

US substations must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security. IEC 61850 is commonly used for substation automation.

This substation integrates renewable wind energy into the grid, supporting clean energy goals and enhancing regional energy resilience.