Overview
Coronet Substation is an operational electrical substation in Florida, United States, owned and operated by TECO. It operates at 69 kV, supporting regional grid stability.
Coronet Substation is an operational electrical substation located in Florida, United States. Owned and operated by TECO, the facility plays a key role in the local power distribution network, stepping down transmission-level voltages for residential and commercial use. The substation operates at 69 kV, a standard sub-transmission voltage level in the United States. As part of TECO's infrastructure, it is subject to NERC reliability standards and FERC regulations, ensuring grid stability and compliance with mandatory reliability requirements. The facility's equipment likely includes circuit breakers, transformers, and switchgear typical of medium-voltage substations. Located in a region with growing energy demand, Coronet Substation supports the electrical infrastructure of the Tampa Bay area. Its operational status contributes to the resilience of the local grid, serving communities and businesses. The facility's role in voltage regulation and power distribution is critical for maintaining reliable electricity supply in the region.
Environmental context
The substation is situated in a subtropical climate zone, where seasonal storms and hurricanes pose risks to electrical infrastructure. Flooding and high winds can affect equipment reliability, necessitating robust design and maintenance practices. The facility's location in an urbanizing area also requires careful management of electromagnetic fields and noise to minimize community impact.
Frequently asked questions
Coronet Substation is located in Florida, United States, near Tampa. Its approximate coordinates are 27.985877, -82.083962.
Coronet Substation operates at 69 kV, which is a common sub-transmission voltage level in the United States.
Coronet Substation is owned and operated by TECO, a major electric utility serving the Tampa Bay area.
As part of the US electrical grid, Coronet Substation must comply with NERC reliability standards and FERC regulations for transmission and sub-transmission assets.
A 69 kV substation steps down higher transmission voltages for distribution to local networks, ensuring reliable power delivery to residential, commercial, and industrial customers.