Substation Operational

CR 672 Substation - High-Voltage Electrical Substation in Florida, United States

United States

Overview

CR 672 Substation is an operational electrical substation in Florida, United States, owned and operated by Tampa Electric Company. It operates at a voltage of 230 kV, indicating a high-voltage transmission-level facility.

CR 672 Substation is a high-voltage electrical substation located in Florida, United States. Owned and operated by Tampa Electric Company, the facility is currently operational and plays a key role in the regional power grid. With a voltage level of 230 kV, it is classified as a transmission substation, which is critical for long-distance electricity transport and grid stability. As a transmission substation operating at 230 kV, CR 672 Substation is subject to regulatory oversight by the Federal Energy Regulatory Commission (FERC) and must comply with North American Electric Reliability Corporation (NERC) reliability standards. These standards ensure the secure operation of the bulk power system. The facility likely includes switchgear, transformers, and protection systems conforming to industry standards such as IEEE C37 for high-voltage equipment. The substation serves the Tampa Bay area, supporting the electrical infrastructure for residential, commercial, and industrial customers. Its location in Florida, a state prone to hurricanes and extreme weather, underscores the importance of grid resilience and emergency preparedness. The facility contributes to the reliability of the regional power supply, helping to meet demand and maintain voltage stability.

Environmental context

The substation is situated in a region with a subtropical climate, which can expose electrical infrastructure to high humidity, lightning strikes, and tropical storms. These environmental factors necessitate robust design and maintenance practices, such as corrosion-resistant materials and surge protection. The facility's location in a developed area means it is integrated into the local grid, with considerations for electromagnetic field management and noise mitigation in compliance with local regulations.

Frequently asked questions

CR 672 Substation is located in Florida, United States, near coordinates 27.764977, -82.262071. It is owned and operated by Tampa Electric Company.

CR 672 Substation operates at a voltage of 230 kV, which classifies it as a high-voltage transmission substation.

CR 672 Substation is owned and operated by Tampa Electric Company, a major utility serving the Tampa Bay area.

As a transmission substation in the United States, CR 672 Substation must comply with NERC reliability standards and FERC regulations to ensure grid stability and security.

A 230 kV substation is a key component of the transmission network, stepping down voltage for distribution or interconnecting different parts of the grid to ensure reliable electricity delivery.
UtilityRadar
More
Press Esc to close · Browse by sector