Overview
Craryville Substation is an operational electrical substation in New York, United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Craryville Substation is an operational electrical substation located in New York, United States. The facility operates at a voltage of 115 kV, placing it in the medium-to-high voltage range typical for sub-transmission and distribution substations. As part of the U.S. electrical infrastructure, it supports the reliable delivery of electricity to local communities and industries. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. The 115 kV voltage level is common for regional power distribution, connecting higher-voltage transmission lines to lower-voltage distribution networks. The facility's location in rural New York suggests it may serve agricultural or residential loads, with typical switchgear and transformer configurations for voltage step-down. Environmentally, the substation's operation is associated with electromagnetic fields and potential impacts on local wildlife, though modern designs minimize these effects. Its role in the grid ensures stable power supply to the surrounding area, supporting economic activity and community services. The substation's age and specific equipment are not detailed, but its operational status indicates ongoing maintenance and compliance with industry standards.
Environmental context
The substation is located in a rural area of New York, where the surrounding landscape includes forests and agricultural land. The 115 kV voltage level indicates moderate electromagnetic field exposure, which is managed through standard siting and shielding practices. The facility's presence supports grid reliability for local communities, but its construction and operation may involve land use changes and habitat fragmentation, typical for linear infrastructure projects.
Frequently asked questions
Craryville Substation is located in New York, United States, at coordinates 42.175072, -73.590420.
Craryville Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution substations in the United States.
Craryville Substation is currently operational, meaning it is actively involved in the transmission and distribution of electricity.
As part of the U.S. electrical grid, Craryville Substation must comply with NERC reliability standards and FERC regulations for bulk power system operation.
A 115 kV substation typically steps down voltage from higher transmission levels (e.g., 230 kV or 345 kV) for distribution to local networks, serving industrial, commercial, and residential customers.