Crystal Lake Wind II is an operational substation in the United States owned by NextEra Energy. It operates at 161 kV, supporting wind energy transmission.
Crystal Lake Wind II is a substation located in the United States, owned and operated by NextEra Energy. The facility is operational and serves as a key node for wind energy integration, with a voltage level of 161 kV, which is typical for medium-to-high voltage transmission in the US grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission assets. As part of the wind energy infrastructure, it likely incorporates modern switchgear and automation systems aligned with ISO/IEC 61850 standards for substation automation. This facility plays a critical role in connecting renewable energy generation to the broader grid, supporting the transition to cleaner energy sources. Its location in a rural area underscores its importance in transmitting power from wind farms to load centers, contributing to grid stability and regional energy supply.
Environmental context
The substation is situated in a rural area of the United States, likely surrounded by agricultural land or open terrain, which is typical for wind energy projects. Its operation at 161 kV indicates a role in regional transmission, with potential environmental considerations including land use for transmission corridors and electromagnetic field management. The facility supports renewable energy, reducing reliance on fossil fuels and contributing to lower carbon emissions.
Frequently asked questions
Crystal Lake Wind II is a substation located in the United States, with coordinates approximately 43.2795 N, -93.8341 W.
Crystal Lake Wind II operates at a voltage of 161 kV, which is a common transmission voltage for connecting wind farms to the grid.
Crystal Lake Wind II is owned by NextEra Energy, a leading renewable energy company in the United States.
US substations must comply with NERC reliability standards and FERC regulations for transmission assets. Facilities often adopt ISO/IEC 61850 for substation automation.
Substations like Crystal Lake Wind II collect power from wind turbines, step up voltage for transmission, and ensure grid stability, enabling efficient delivery of renewable energy.