Overview
Dill Substation is an operational electrical substation in the United States, owned and operated by Roosevelt Public Power District. It operates at 34.5 kV, serving the local grid.
Dill Substation is an operational electrical substation located in the United States, owned and operated by Roosevelt Public Power District. The facility operates at a voltage level of 34.5 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure in rural areas. As part of the U.S. electrical grid, Dill Substation operates under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) and adheres to reliability standards set by the North American Electric Reliability Corporation (NERC). The substation likely employs standard switchgear and protection systems compliant with industry practices, though specific equipment details are not disclosed. The substation plays a critical role in local power distribution, ensuring stable electricity supply to the surrounding community. Its location in a rural area underscores its importance for grid connectivity and reliability, supporting agricultural and residential loads in the region.
Environmental context
The substation is situated in a rural area of Nebraska, characterized by agricultural land and low population density. The environmental impact is minimal, with typical considerations including electromagnetic field management and vegetation clearance around the site. The facility's operation supports local energy needs without significant disruption to the surrounding ecosystem.
Frequently asked questions
Dill Substation is located in the United States, with coordinates approximately 41.902232 N, -103.720155 W, in a rural area likely in Nebraska.
Dill Substation operates at a voltage of 34.5 kV, which is typical for distribution-level substations in the United States.
Dill Substation is owned and operated by Roosevelt Public Power District, a public utility serving the local area.
In the United States, substations must comply with NERC reliability standards and FERC regulations, ensuring grid stability and safety.
A 34.5 kV substation typically steps down transmission voltage for local distribution, serving residential, commercial, and industrial customers in its area.