Overview
Drasco Substation is an operational electrical substation in Arkansas, United States, owned and operated by First Electric Cooperative Cooperation. It handles voltages of 69 kV and 13.2 kV, serving the local grid.
Drasco Substation is an operational electrical substation located in Arkansas, United States, owned and operated by First Electric Cooperative Cooperation. The facility is part of the regional electrical infrastructure, stepping down transmission-level voltage for distribution to local consumers. The substation operates at two voltage levels: 69 kV for transmission and 13.2 kV for distribution, indicating a medium-voltage facility typical of rural cooperative networks. As a substation, it likely includes switchgear, transformers, and protection systems compliant with NERC reliability standards and FERC regulations for grid stability. This substation plays a key role in delivering reliable electricity to the cooperative's members in rural Arkansas. Its location in a sparsely populated area underscores its importance for maintaining grid stability and supporting local communities. The facility's operational status ensures continued service to the region.
Environmental context
Located in rural Arkansas, Drasco Substation operates in an area with low population density and natural landscapes. The substation's voltage levels and equipment are designed to minimize environmental impact while ensuring grid reliability. Typical environmental considerations for such facilities include oil containment for transformers and noise mitigation from switchgear.
Frequently asked questions
Drasco Substation is located in Arkansas, United States, at coordinates 35.596385, -91.925687.
Drasco Substation operates at 69 kV for transmission and 13.2 kV for distribution, typical for a medium-voltage substation.
Drasco Substation is owned and operated by First Electric Cooperative Cooperation, a rural electric cooperative in Arkansas.
Substations in the U.S. must comply with NERC reliability standards for grid stability and FERC regulations for transmission-level assets, along with local utility requirements.
Substations like Drasco step down high-voltage electricity from transmission lines to lower voltages for distribution to homes and businesses, ensuring reliable power delivery.