Substation Operational

East Altoona Substation - Penelec Electrical Substation in Altoona, Pennsylvania

United States

Overview

East Altoona Substation is an operational substation in Altoona, Pennsylvania, owned and operated by Penelec. It plays a key role in the regional electrical grid.

East Altoona Substation is an operational electrical substation located in Altoona, Pennsylvania, United States. Owned and operated by Penelec, a subsidiary of FirstEnergy, the facility is part of the regional transmission and distribution network serving central Pennsylvania. As a substation, East Altoona likely handles voltage transformation and switching to support local distribution. The facility operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring grid reliability and compliance with reliability standards. Typical substations in this region range from 69 kV to 138 kV for distribution, with transmission voltages up to 500 kV. The substation contributes to the stability and resilience of the local power grid, serving residential, commercial, and industrial customers in the Altoona area. Its operational status ensures continued electricity supply, supporting community services and economic activities.

Environmental context

East Altoona Substation is located in a mixed urban and suburban area of central Pennsylvania. The facility's environmental impact is primarily associated with electromagnetic fields and potential oil containment from transformers. Standard mitigation measures include proper drainage and spill containment systems. The substation's location in a developed area reduces direct impact on natural habitats.

Frequently asked questions

East Altoona Substation is located in Altoona, Pennsylvania, United States, at coordinates 40.536957, -78.374089.

East Altoona Substation is owned and operated by Penelec, a subsidiary of FirstEnergy, which provides electricity to customers in Pennsylvania.

Substations like East Altoona transform voltage levels and switch electrical circuits to ensure reliable power distribution. They are critical nodes in the grid connecting transmission lines to local distribution networks.

Substations in the U.S. must comply with NERC reliability standards and FERC regulations. These cover equipment maintenance, cybersecurity, and operational protocols to ensure grid stability.

East Altoona Substation supports the regional grid by distributing electricity to homes and businesses in the Altoona area, helping maintain voltage stability and service reliability.
UtilityRadar
More
Press Esc to close · Browse by sector