Overview
East Krok is an operational substation in the United States, handling voltages of 138 kV and 69 kV. It plays a key role in regional grid stability and power distribution.
East Krok is an operational substation located in the United States, with coordinates 44.428599, -87.572616. It operates at voltage levels of 138 kV and 69 kV, indicating its role in both transmission and sub-transmission networks. The facility is part of the broader electrical infrastructure that ensures reliable power delivery to surrounding areas. As a substation in the United States, East Krok operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards mandate reliability, cybersecurity, and operational protocols for grid-connected assets. The dual voltage levels suggest the substation serves as a critical node for stepping down power from high-voltage transmission lines to lower-voltage distribution networks. The substation's location in a rural area of Wisconsin, near the town of Kewaunee, positions it to support local agricultural and residential loads. Its operational status ensures continued grid stability and power quality for the region. Substations like East Krok are essential for maintaining the balance between electricity generation and consumption, and for integrating renewable energy sources into the grid.
Environmental context
The substation is situated in a rural area of Wisconsin, characterized by agricultural land and proximity to Lake Michigan. Its operation involves managing electromagnetic fields and potential oil spill risks from transformers. The site's location away from dense urban centers reduces direct population exposure, but the substation's age and maintenance practices influence its environmental footprint. Proper vegetation management and stormwater controls are typical for such facilities to minimize ecological impact.
Frequently asked questions
East Krok substation is located in the United States, near Kewaunee, Wisconsin, at coordinates 44.428599, -87.572616.
East Krok substation operates at 138 kV and 69 kV, serving both transmission and sub-transmission functions.
East Krok substation is currently operational, actively contributing to the regional power grid.
Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.
Substations transform voltage levels, switch circuits, and protect the grid, enabling efficient power transmission and distribution from generation sources to consumers.