Substation Operational

EDC 2A Substation - Pittsburgh, Pennsylvania Electrical Infrastructure

United States

Overview

EDC 2A is an operational substation located in the United States, serving as a node in the electrical grid. Its coordinates place it near Pittsburgh, Pennsylvania, contributing to regional power distribution.

EDC 2A is an operational substation located in the United States, with coordinates near Pittsburgh, Pennsylvania. As a substation, it plays a critical role in voltage transformation and power distribution within the electrical infrastructure network. The facility is part of the broader grid that supports residential, commercial, and industrial electricity demand in the region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission and distribution assets. Substations of this type typically handle medium to high voltage levels, stepping down power for local distribution. The facility's location in an urbanized area suggests it serves a dense load center. EDC 2A contributes to grid stability and reliability in the Pittsburgh metropolitan area. Its operational status ensures continuous power supply to surrounding communities. The substation's role in the electrical infrastructure is vital for maintaining service continuity and supporting economic activity in the region.

Environmental context

The substation is situated in a temperate climate zone with distinct seasons, which influences electrical demand patterns. Its urban location near Pittsburgh means it supports a high-density load area, requiring robust infrastructure to manage peak loads. The facility's environmental impact is primarily related to electromagnetic fields and land use, typical for substations in developed areas.

Frequently asked questions

EDC 2A substation is located in the United States, near Pittsburgh, Pennsylvania, at coordinates 40.305019, -79.875695.

EDC 2A substation is operational, meaning it is actively functioning as part of the electrical grid.

Substations in the United States operate under NERC reliability standards and FERC regulations, ensuring grid stability and safety.

Substations in urban areas typically handle medium to high voltages, such as 69 kV to 138 kV, stepping down for local distribution.

EDC 2A serves as a node in the power distribution network, transforming voltage levels and ensuring reliable electricity supply to the Pittsburgh region.