Overview
EDC C10 is an operational substation located in the United States, serving as a node in the electrical grid. Its coordinates place it near Pittsburgh, Pennsylvania, indicating a role in regional power distribution.
EDC C10 is a substation located in the United States, with coordinates near Pittsburgh, Pennsylvania. As an operational substation, it plays a critical role in the electrical infrastructure by stepping voltage levels for transmission or distribution. The facility is part of the broader North American power grid, which is regulated by NERC reliability standards and FERC oversight for interstate transmission. Substations like EDC C10 typically contain switchgear, transformers, and protection equipment to manage voltage levels and ensure grid stability. Substations in this region commonly operate at transmission voltages (115 kV to 765 kV) or distribution levels (4 kV to 34.5 kV). The facility's location in an urban-industrial area suggests it may serve a mix of residential, commercial, and industrial loads. The operational significance of EDC C10 lies in its contribution to grid reliability and local power delivery. Substations are essential for isolating faults, regulating voltage, and enabling maintenance without disrupting supply. Given its location in a densely populated region, this facility likely supports critical infrastructure and community energy needs.
Environmental context
The substation is situated in a temperate climate zone near Pittsburgh, Pennsylvania, an area with a history of heavy industry and coal-fired power generation. While substations themselves have minimal direct environmental impact, their role in the grid influences the efficiency and reliability of electricity delivery. The surrounding region is transitioning toward cleaner energy sources, which may affect future grid operations and the substation's role in integrating renewable generation.
Frequently asked questions
EDC C10 substation is located in the United States, with coordinates near Pittsburgh, Pennsylvania. The exact address is not publicly listed, but its geographic position places it within the regional electrical grid serving the Pittsburgh metropolitan area.
EDC C10 is reported as operational, meaning it is actively functioning as part of the electrical infrastructure. Operational substations continuously manage voltage levels and ensure reliable power distribution to connected loads.
Specific voltage levels for EDC C10 are not publicly available. However, substations in the United States typically operate at transmission voltages (115 kV to 765 kV) or distribution voltages (4 kV to 34.5 kV), depending on their role in the grid.
As a substation in the United States, EDC C10 operates under NERC reliability standards for bulk power system reliability and FERC regulations for interstate transmission. Compliance with these frameworks ensures grid stability and safety.
EDC C10 serves as a node in the electrical grid, stepping voltage levels and enabling power flow between transmission and distribution networks. It helps maintain voltage stability, isolate faults, and support reliable electricity delivery to the Pittsburgh region.