Overview
Elastimold Substation is an operational electrical substation in New Jersey, United States, owned and operated by Jersey Central Power and Light. It operates at a voltage of 230 kV, indicating a transmission-level facility critical to regional grid s
Elastimold Substation is an operational electrical substation located in New Jersey, United States. Owned and operated by Jersey Central Power and Light, a subsidiary of FirstEnergy, this facility plays a key role in the regional transmission network. With a voltage level of 230 kV, it is classified as a high-voltage substation, typically used for bulk power transmission and interconnection with other grid assets. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission-level assets. As part of the PJM Interconnection, the facility must comply with mandatory reliability standards, including NERC's Critical Infrastructure Protection (CIP) requirements. The 230 kV voltage level is common for subtransmission and transmission applications, serving as a backbone for distributing electricity from generation sources to distribution networks. Elastimold Substation contributes to the electrical infrastructure serving northern New Jersey, an area with high population density and industrial activity. Its location near major load centers ensures reliable power delivery to residential, commercial, and industrial customers. The substation's operational status and voltage class underscore its importance in maintaining grid stability and supporting the region's energy needs.
Environmental context
The substation is situated in a region with mixed urban and suburban development, typical of northern New Jersey. The local environment includes proximity to residential areas and natural habitats. As a high-voltage substation, its environmental impact is primarily related to electromagnetic fields and land use. Modern substations often incorporate SF6-insulated switchgear, which has a high global warming potential if leaked. The surrounding area's ecological sensitivity is moderate, with potential impacts on local wildlife from construction and maintenance activities.
Frequently asked questions
Elastimold Substation is located in New Jersey, United States, at coordinates 40.832294, -74.824628. It is owned and operated by Jersey Central Power and Light.
Elastimold Substation operates at a voltage of 230 kV, which is a high-voltage level used for transmission and subtransmission in the electrical grid.
Elastimold Substation is owned and operated by Jersey Central Power and Light, a subsidiary of FirstEnergy Corporation.
As a transmission-level substation in the United States, Elastimold Substation must comply with NERC reliability standards and FERC regulations. It is part of the PJM Interconnection and subject to mandatory reliability and cybersecurity requirements.
A 230 kV substation serves as a node in the transmission network, stepping down voltage from higher levels (e.g., 500 kV) to lower levels for distribution, or interconnecting generation sources. It is critical for grid stability and power flow management.